I’m a complete novice when it comes to pressure vessels, and I work in pressure vessel design. I have a small question for the experts here: when using forged pipes for the openings on the pressure vessel cylinder, under what circumstances should Class A welds be used, that is, welding in a butt joint style with the cylinder? Or is there some standard that specifies this? I would appreciate it if the experts could provide guidance.
It’s the other way around: for Class A weldable pipes, forged pipes should be used, not the other way around
I just want to know when Class A welds should be used; is there a specific standard that specifies this?
The welded connections for openings in the pressure vessel shell use Class A welds in a butt joint configuration; this approach is typically employed in situations where high pressures are involved or when the vessel is of high importance, as Class A welds offer better strength and sealing properties. As for whether to use Class A welds, reference can be made to the specific requirements regarding cutouts and nozzles in the \"Code for Design of Steel Pressure Vessels\" or the \"ASME Boiler and Pressure Vessel Code\". These standards provide detailed guidance based on factors such as the size of the connection, operating pressure, and the medium. .
You are referring to embedded takeover, whose connection type is Type A connections; it is generally used for pressure vessels designed according to standard 4732, or fatigue-resistant vessels such as adsorption towers and purifiers.
There are no particularly specific regulations; it mainly depends on the design requirements, and in the industry, high-pressure and fatigue-resistant containers are chosen for such applications