HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

13 Mnemonics for Equipment Management

2024-10-17View Original

Thread Content

1. Three principles for equipment selection: technological advancement; Economically reasonable ; Suitable for production. 2. Three-level network system for equipment management: Level 1: Corporate level ; Level 2: Workshop level ; Level 3: Team level. 3. Three-full management of equipment: comprehensive management ; Total staff management ; Full-process management. 4. Three strict requirements for equipment inspection and maintenance: strictly follow the inspection plans and procedures ; Strictly control the quality of spare parts ; Strictly ensure the quality of maintenance work and the completion acceptance process. 5. Three principles for safe operation: Adhere to the shift handover system ; Insist on working with a valid license ; Persist in emphasizing safety, process standards, and labor discipline. 6. Level 3 maintenance: Routine maintenance (daily maintenance) ; Level 1 maintenance (monthly maintenance) ; Secondary maintenance (annual service). 7. The three principles for handling accidents: Do not move on until the cause of the accident is identified ; Never let those responsible lack education ; No lapse in taking preventive measures will be tolerated. 8. Three goods, four understandings, and four skills in equipment operation: The three goods refer to proper management, proper use, and proper maintenance ; The four understandings refer to understanding the principles, structure, performance, and applications ; The four skills refer to knowing how to use, maintain, inspect, and troubleshoot. 9. Four requirements for equipment use: order, cleanliness, lubrication, and safety. 10. The five-step method for equipment inspection: look, listen, touch, smell, check. 11. Eight fixed principles for equipment inspection: fixed person, fixed location, fixed method, fixed cycle, fixed standard, fixed plan, fixed records, and fixed process. 12. Three-stage inspection system for equipment: operator’s self-inspection ; Mechanic mutual inspection ; Special inspection by technical personnel. 13. Trinity inspection: post inspection, specialized inspection, and precise inspection.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.