HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Should metal bellows compensators be tested separately or together with the pipeline?

2025-04-09View Original

Thread Content

Should metal bellows compensators be tested separately or together with the pipeline?
Reply #22025-04-09
It passed the voltage resistance test before leaving the factory.
Reply #32025-04-09
Metal bellows compensators usually require separate testing to ensure that their performance and pressure resistance meet the standards. After completing the individual tests, a comprehensive test can also be carried out after installation in the piping system to verify the overall performance of the system. .
Reply #42025-04-15
Tests are conducted before leaving the factory, and further tests are carried out along with the pipeline after installation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.