HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

First and Second Round Peak Competitions: Guoneng Yulin’s Hundred-Million-Yuan Equipment Tender (Hydrogenation Reactor)

2026-02-06View Original

Thread Content

The competition between CSSC First Heavy Industries and CSSC Second Heavy Industries for the billion-yuan worth contract related to hydrogenation reactors in the Guoneng Yulin project – read it in full immersion using a novel reader. On February 3rd, the list of candidates for the hydrogenation reforming unit reactor component of the Shenhua Yulin Circular Economy Coal Comprehensive Utilization Project was made public, with CSSC First Heavy Industries and CSSC Second Heavy Industries appearing on that list. Details are as follows: First winning bidder: ERIC (Deyang) Heavy Equipment Co., Ltd. Bid price (in ten thousand RMB): 8487.570000. Second winning bidder: CRCC Dalian Nuclear Power & Petrochemical Co., Ltd. Bid price (in ten thousand RMB): 9072.700000. Price difference between CRCC and ERIC: 585.13 ten thousand RMB ; Difference rate: 6.89%. The scope of this project’s bidding includes 1 hydrogenation refining reactor and 1 hydrogenation reforming reactor, as well as the accompanying accessories, internals, spare parts, inspection, transportation, technical services, and on-site welding. The performance requirement is that, from December 2017 to the bid deadline (subject to the contract signing date), the bidder must have at least two records of supplying hydrogenation reactors with an inner diameter of ≥Φ4000mm, a wall thickness of ≥160mm, and a shell forging material of 12Cr2Mo1V (or 2.25Cr1Mo0.25V, or SA336F22V), such reactors having been in operation for 1 year or more. According to the relevant information, the two reactors are expected to require on-site welding work, with a delivery period of 14 months.
Reply #22026-02-06
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-02-06
The 【Haichuan Equipment Guessing】 series will continue to be updated in 2027 – all Haichuan fans are welcome to participate actively! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=2079686 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-02-06
【Haichuan Spring Festival Tea House】Old items seen upon returning to one’s hometown – do you recognize them? (28)- https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713054 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-02-06
In terms of strength, performance, or core capabilities, the first party is superior, so the second party can only engage in price wars.
Reply #62026-02-07
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial demonstration plant for high-pressure methane-carbon dioxide dry reforming was successfully put into operation from 2030 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712818 (Source: Haichuan Chemical Forum (HCBBS))
Reply #72026-02-09
Please explain in detail where the strengths lie?
Reply #82026-02-10
【Haichuan Spring Festival Tea House】Old items seen upon returning to one’s hometown – do you recognize them? (41)--For three meals a day https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713456 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-02-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】The comprehensive set of technologies for producing magnesium-based solid hydrogen storage materials with independent intellectual property rights in China has passed the evaluation process. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713092 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-02-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】The project aimed at localizing major equipment at the Beijing Aerospace Power Research Institute, titled “Relief Valve for LNG Storage Tanks”, completed between 2009 and 2026, has passed the acceptance review. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713103 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.