HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The Shanxi Xiaxin project is operating at full capacity

2021-11-16View Original

Thread Content

The Shanxi Xiaxin Project Has Reached Full Production Capacity Author/Source: Donghua Technology ECEC Date: 2021-11-16 Clicks: 13 On November 14, the project to produce 300,000 tons per year of methanol along with ammonia from coke oven gas, as part of the fine chemicals and new materials recycling initiative undertaken by Donghua Technology for Shanxi Xiaxin New Energy Technology Co., Ltd. (hereinafter referred to as the “Shanxi Xiaxin Project”), reached full production capacity. This marks the entry of the project into its normal operational phase, laying a solid foundation for continuous and stable production in the future. The Shanxi Axin project underwent 12 months of round-the-clock construction; mechanical completion was achieved on May 30 this year, intermediate handover of the project took place on July 18, high-quality methanol was produced on September 7, and synthetic ammonia was produced in early November.
Reply #22021-11-17
Didn’t it say it was only being tested? Yet it’s already at full load

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.