HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Guangxi Xinlianxin’s 22.9-billion-yuan coal chemical project for 1.2 million tons per year of synthetic ammonia has commenced full-scale construction

2024-09-19View Original

Thread Content

Green Chemical New Materials Project of Guangxi Xinlianxin Chemical Industry Co., Ltd.
Developer: Guangxi Xinlianxin Chemical Industry Co., Ltd.
Nature of construction: New construction
Location: Guiping City, Guangxi Zhuang Autonomous Region (Guiping New Materials Industrial Park)
Land area: The construction project covers an area of 1,676,675 m2.
Project investment: The total investment amounts to 1,199,412 million yuan, of which approximately 979,200 million yuan is allocated to environmental protection measures.
Production capacity: 1.2 million tons per year of synthetic ammonia, 650,000 tons per year of urea, 950,000 tons per year of new types of high-efficiency nitrogen fertilizers, 1 million tons per year of high-efficiency compound fertilizers and water-soluble fertilizers, 160,000 tons per year of melamine, 500,000 tons per year of ammonium carbonate, 400,000 tons per year of formaldehyde, 400,000 tons per year of hydrogen peroxide, 500,000 tons per year of exhaust gas treatment agents for vehicles and ships, and 200,000 tons per year of organic amines. Construction contents: The main components of the project include a gasification unit, a purification unit, an ammonia synthesis unit, a urea production unit, an air separation unit, units for producing high-efficiency compound fertilizers and water-soluble fertilizers, a unit for producing fluids for treating vehicle and ship exhaust gases, a hydrogen peroxide production unit, a melamine production unit, an ammonium carbonate production unit, a formaldehyde production unit, an organic amine production unit, units for producing liquid products as by-products of air separation as well as rare gases, and a sulfuric acid production line ; Auxiliary facilities mainly include air compressors stations, boiler rooms, desalination plants, heat recovery systems, flare systems, a central laboratory, and administrative buildings ; Storage and transportation engineering mainly includes coal yards, ash storage areas, machine repair shops, general warehouses, conveyor belts, tank farms, chemical storage areas, and product warehouses ; The utility facilities mainly include water treatment plants, substations, fire stations, foam stations, etc ; Environmental protection engineering primarily includes wastewater treatment, reclaimed water reuse, exhaust gas treatment, zone-specific anti-seepage measures, flare systems, hazardous waste storage facilities, solid waste storage facilities, initial rainwater ponds, and emergency spill response ponds. Rendering of the planned Guiping New Materials Industrial Park. The Green Chemical New Materials Project by Guangxi Xinlianxin Chemical Industry Co., Ltd. will be carried out in two phases. The total investment for Phase I is approximately 12 billion yuan. It is planned to complete the construction and commissioning of the project in three years, in multiple stages ; The total planned investment for the second-phase project is around 10 billion yuan. It focuses on the development of integrated projects that combine coal chemical and petrochemical processes, with propylene, petroleum benzene, methanol, and propane being purchased externally to facilitate the production of raw materials and intermediates used in industries such as pharmaceuticals, textiles, and fine chemicals, including butanol, caprolactam, nylon, and acetic acid.
Reply #22024-09-19
【Ten Years of Great Development in Chemical Equipment】 In 1960, the development of a complete set of technologies for producing multiphase-structured polypropylene alloys within reactors with a capacity of 300,000 tons/year was successfully evaluated. https://bbs.hcbbs.com/thread-5670751-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #32024-09-20
This post was last edited by caocheng on 2024-9-20 09:47. Is it related to the newly dug canal? I. Significant economic benefits: Output value and profits and taxes: Once operational, this project is expected to generate an annual output value of around 13.6 billion yuan (for Phase 1), as well as annual profits and taxes of about 2.16 billion yuan (for Phase 1), thereby providing strong impetus for economic growth in the local area as well as in Guangxi. Job opportunities: The construction and operation of the project will create numerous job opportunities, helping to alleviate local employment pressures and increase residents’ income levels. II. Industrial upgrading and transformation to promote the development of the chemical industry: This project is the largest manufacturing project introduced in Guigang City since its establishment, and it represents an important step taken by Guiping City to implement the autonomous region’s strategy of strengthening industry in Guangxi. It will drive the upgrading and transformation of the local chemical industry, as well as promote the extension of the industrial chain and the enhancement of the value chain. Formation of industrial clusters: The construction of this project will attract more related enterprises and industries to gather in the Guiping New Materials Industrial Park, creating an industrial cluster effect that will further boost regional economic development. III. Technological Innovation and Leadership: Application of advanced technologies – The project makes use of sophisticated processes for gasification, purification, and synthesis, thereby improving production efficiency and product quality. Demonstration and leading role: As a large-scale coal chemical project, its successful implementation will set a benchmark for the industry and drive technological innovation and green development in the coal chemical sector. IV. Social and Environmental Benefits: Environmental protection investments: The project’s expenditure on environmental protection measures amounts to approximately 979.2 million yuan, accounting for 6.44% of the total project investment, which helps to ensure that the environmental impact of the project during its construction and operation phases is effectively controlled. Resource recycling: The project emphasizes the recycling of resources and energy conservation, which helps promote green development at the local level as well as in Guangxi. Social contribution: The successful implementation of the project will enhance the local infrastructure, improve the quality of life for residents, and contribute to social development. V. Strategic Significance: Regional Collaborative Development: This project helps to promote the collaborative development of Guiping City, as well as Guigang City, with surrounding areas, thereby enhancing the overall competitiveness of the regional economy. **Energy security: As a coal chemical project, it helps to ensure **energy security to a certain extent and reduces dependence on external energy sources.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.