The commissioning of Brazil’s **Petroleum Company’s new large-scale urea plant with a production capacity of 1.3 million tons will be delayed from the originally planned date of 2027 to 2029

2025-12-08View Original

Thread Content

Recently, Petrobras announced that the commissioning of its new large-scale urea plant in Bahia state, in the northeast of Brazil, will be delayed from the originally planned date of 2027 to 2029. The project is designed with an annual production capacity of 1.3 million tons, and it is one of the key strategic projects in Brazil’s efforts to enhance its self-sufficiency in fertilizers and reduce its dependence on imports for agricultural purposes.   Bagoil stated that this delay is mainly due to a variety of complex factors. The project approval process must meet stricter environmental licensing requirements, and ongoing tensions in the global supply chain have also affected the delivery timelines for key equipment. To ensure the advancement of the technical solutions and their long-term competitiveness, the company has decided to optimize the design of certain aspects of the project, which also requires more time to complete. The total project investment is expected to rise to around $2.8 billion as a result.   This delay means that Brazil will need to maintain high levels of urea imports in the coming years, and its costs for agricultural inputs may continue to be affected by fluctuations in international market prices. Currently, there are still several urea production projects under construction around the world, and when these plants come online in 2029, they will face a new market supply and demand landscape.
Reply #22025-12-08
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Problems Specific to Factories in the North: Stools in employee rest rooms lack backs and are placed right next to heating units. https://bbs.hcbbs.com/thread-5707651-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-12-08
【Sea and River Safety Discussion】Hidden Dangers Around Us – What is the difference between calibration and verification of four-in-one gas detection alarms? How should it be executed? https://bbs.hcbbs.com/thread-5707652-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42025-12-08
【Ten Years of Rapid Development in Chemical Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #52025-12-09
[Haichuan Chemical Technology Documentation] 39 requirements for the layout of common equipment in chemical plants – worth saving! https://bbs.hcbbs.com/thread-5707686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #62025-12-09
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035, Pingmei Shenma Hydrogen Chemistry Company managed to achieve the domestic production of spare parts for high-pressure coal slurry pumps used in gasification units. https://bbs.hcbbs.com/thread-5707406-1-1.html (Source: Hachuan Chemical Industry Forum (HCBBS))
Reply #72025-12-10
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via biofermentation using 50,000 tons per year of syngas successfully yielded high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2888-2025: Dongfang Electric’s floating wind power hydrogen production platform receives the world’s first approval certificate https://bbs.hcbbs.com/thread-5707552-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-11
【Ten Years of Rapid Development in Chemical Processing Equipment】For the first time in China, a full-scale venting test of a 10-megapascal high-pressure hydrogen pipeline was successfully carried out from 2893 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-11
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via biofermentation using 50,000 tons per year of syngas successfully yielded high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.