Equipment (furnace) – where to? (11)

2014-05-09View Original

Thread Content

I worked 6 days this week; I really long for a vacation. Wishing everyone a pleasant weekend in advance. Today, let’s talk about the layout of the furnace. Issue 11: Layout of Heating Furnaces. The layout of heating furnaces is actually quite similar to that of vertical storage tanks; the main consideration is the issue of open flames. Therefore, open-flame heating furnaces should be placed together with other open-flame equipment at the edge of the facility, near fire exits. It is also necessary to take into account the wind direction in the event of a fire caused by a leak of combustible gases. It can also be arranged in alignment with the center line, facilitating the sharing of platforms and chimneys. When arranging the heating furnace, consideration must be given to the passages for maintaining the furnace tubes, as well as the spaces and areas required for lifting them. The length of the horizontal area designated for maintaining the furnace tubes should be at least equal to the length of the tubes plus an additional two meters. For tubes with burners at the bottom, attention must be paid to the space required for the piping; a clearance of at least 2 meters is necessary as a maintenance passage. As an example, refer to the foundation shown in the image below. Additionally, consideration must be given to the space and orientation needed for lifting the furnace tubes. It is advised to the designers that lifting can actually be done in a direction perpendicular to that of the furnace tube extraction; it is not necessary to lift it in a straight line aligned with the furnace tube. Here’s a picture of the construction of the hoisted heating furnace. The steam drum of the furnace is located on or near the furnace top, while pre-treatment equipment such as the fuel gas separation tank must be placed at a distance of more than 6 meters from the furnace. Accessories of the heating furnace itself, such as blowers and exhaust fans, are installed in locations that do not interfere with the maintenance and lifting operations of the furnace itself, and they are placed as close as possible to it. Finally, there is the distance from the open-flame furnace: it should be more than 22.5 meters away from liquefied hydrocarbon equipment or Class A gas compressors that are installed outdoors; if a fire wall is placed between them, this distance can be as low as 15 meters (the wall in the compressor room, if it has no windows, can serve as such a fire wall). The height of the wall must be at least 3 meters, and the distance between the wall and the furnace should not exceed 5 meters. As for the length of the wall, I’ll illustrate it with a diagram below. My computer doesn’t have CAD, so please understand; I’ll draw a few strokes instead. That’s roughly the layout of the furnace; the more detailed aspects, such as the air damper platforms, are as follows. For the crater platforms, as long as proper operations and maintenance are taken into account, there are generally no major issues. To conclude, here is a night-time photo of the furnace at the Inner Mongolia project. See you next time. ---------------------------------------I am a divider line------------------------------------- Where to go with the device? (1) http://bbs.hcbbs.com/thread-1286874-1-1.html Where are the devices going? (2) http://bbs.hcbbs.com/thread-1287989-1-1.html Where are the devices going? (3) http://bbs.hcbbs.com/thread-1288786-1-1.html Where are the devices going? (4) http://bbs.hcbbs.com/thread-1290002-1-1.html Where are the devices going? (5) http://bbs.hcbbs.com/thread-1291005-1-1.html Where are the devices going? (6) http://bbs.hcbbs.com/thread-1292114-1-1.html Where are the devices going? (7) http://bbs.hcbbs.com/thread-1293086-1-1.html Where are the devices going? (8) http://bbs.hcbbs.com/thread-1294198-1-1.html Where are the devices going? (9) http://bbs.hcbbs.com/thread-1295237-1-1.html Where are the devices going? (10) http://bbs.hcbbs.com/thread-1296890-1-1.html For more interesting content, please visit my space{:1_90:}{:1_90:}{:1_90:} http://bbs.hcbbs.com/home.php?mod=space&uid=891276 I will share each update with my followers; feel free to communicate, ask questions, and provide feedback.
Reply #22014-05-09
This post was last edited by Annie’s Baby on 2014-5-9 08:50. The night view of the flower-displaying device is really beautiful. I can see that the first two photos show vertical furnaces; our boilers are of this type as well. The other furnaces are horizontal, arranged in a row like a snake
Reply #32014-05-09
This post was last edited by asky123 on 2014-5-9 09:22. Bench? Regarding the third diagram, is the bottom support point placed at such a high level to facilitate maintenance or for safety and fire protection reasons?
Reply #42014-05-09
The last edit to this post was made by liu860 on 2014-5-9 at 14:11. In the diagram drawn by hand, do A and B refer to the distance from the firewall, specifically the vertical distance from the furnace and compressor to the firewall? Or the distance to the firewall edge?
Reply #52014-05-09
After reading it, I didn’t dare ask too many questions, as this concept is quite abstract. Let’s take a look at everyone’s questions.
Reply #62014-05-09
Will we only talk about heating furnaces, or will we also discuss conversion furnaces separately in the future?
Reply #72014-05-09
Why are there fans of different sizes installed on large furnaces?
Reply #82014-05-09
I just finished reading about the heating furnaces used in residue hydrogenation yesterday. Gao Dasha is already starting to give us extra lessons so quickly – that’s great. I’ll reserve a spot for now; I’ll ask questions right away if there’s anything I don’t understand.:)
Reply #92014-05-09
10th floor, sit down first and take your time to look around, hehehe
Reply #102014-05-09
When you mentioned the long snake formation, I remembered something: I had a project in Qinghai where the client insisted that the furnaces had to be placed in locations determined by feng shui principles. A master was brought in to examine the site for over half a month, and eventually four locations were chosen, as those spots were considered suitable for suppressing negative energies. Furnaces were then built in those four locations – heat transfer oil furnaces, two boilers, and a large heating unit. The layout design resulted in absolute chaos among everyone involved. Hehe.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.