HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Simple operation steps for the wastewater transfer pump

2019-05-14View Original

Thread Content

2.jpg Simple operating steps for the wastewater transfer pump: 1. Contact the utilities dispatch team to inform them that the Gaomi facility needs to transfer production wastewater, and provide them with the relevant analysis parameters. 2. Open the water supply valve at the pump’s inlet. 3. Start the pump and gradually increase the opening of the outlet valve. 4. Verify that the outlet pressure and flow rate are normal. 5. Slowly close the water supply valve at the pump’s inlet

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.