Donghua Technology signs an EPCM contract for a high-end resin material project with the largest capacity in China
Thread Content
Recently, China Chemical Donghua Company signed an EPCM contract for the project management of high-end phenolic, benzoxazine resins, and specialty epoxy resins produced by Shandong Aigesen. Upon completion, this project will become the highest-capacity production base for high-end resins in China, effectively reducing the country’s reliance on imported high-end resin materials. The project is located in the Qilu Chemical Industrial Park in Zibo, Shandong, covering an area of 280 mu. It will feature facilities with an annual production capacity of 700,000 tons of high-end phenolic/benzoxazine resins, 200,000 tons of special epoxy resins (both representing the highest capacity of their kind in China), as well as 270,000 tons of formaldehyde-related products. These products are intended for use in high-end fields such as aerospace and 5G communications. As the general contractor for the project, Donghua Company is responsible for the engineering design and overall project management, implementing control over cost, schedule, quality, and safety to deliver standardized \"turnkey\" projects; this is an application of its \"T+EPC\" model. The company will advance various tasks related to the project to support the development of the new materials industry. Project Name: EPC+M General Contracting for the High-End Phenolic, Benzoxazine Resins and Special Epoxy Resins Project of Shandong Aigson Environmental Protection New Materials Co., Ltd.Owner: Shandong Aigson Environmental Protection New Materials Co., Ltd.
Location: The project is situated within the Qilu Chemical Industrial Park in Zibo City, Shandong Province. The site is bordered by reserved land to the east, Olefin Road to the west, open space to the south, and Fengwang Road to the north, covering an area of 280 mu. Construction scale: The project mainly involves the construction of production facilities capable of manufacturing 700,000 tons per year of high-end phenolic/benzoxazine resins and 200,000 tons per year of special epoxy resins, along with a corresponding production facility for 270,000 tons per year of formaldehyde as a raw material. This project will be constructed in phases. The main construction components include: in Phase 1, a production facility for 350,000 tons of high-end phenolic/benzoxazine resins, a production facility for 100,000 tons of special epoxy resins, and a production facility for 180,000 tons of formaldehyde. Additionally, auxiliary facilities such as offices, fire protection systems, power distribution systems, warehouses, tank areas, and sewage treatment systems will be built as well. In the second phase, a production facility for 350,000 tons of high-end phenolic/benzoxazine resins, a production facility for 100,000 tons of special epoxy resins, and a production facility for 90,000 tons of formaldehyde will be built, along with supporting facilities such as raw material warehouses, finished product warehouses, raw material tanks, and recirculation water stations. The estimated contract price is 1,507,448,100.00 yuan. Winning bidder: Guizhou Donghua Engineering Co., Ltd. Consortium member: Donghua Engineering Technology Co., Ltd