HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

EPC Tender for the Renovation and Expansion of the Atmospheric Distillation Unit and the Central Control Room at Sinopec Tahe Refining & Chemical Plant

2025-08-30View Original

Thread Content

The project owner is Sinopec Tahe Refining & Chemical Co., Ltd., with the construction funds coming from bank loans and funds raised by the company itself. The funding ratio is 70% from bank loans and 30% from the company’s own funds. The tendering party is Sinopec Tahe Refining & Chemical Co., Ltd. The renovation and expansion of the 1# atmospheric distillation unit with a capacity of 1.5 million tons per year in the refinery area of the Tahe Refining & Chemical Company’s integrated refining and chemical project into a 3# vacuum distillation unit with a capacity of 5 million tons per year, as well as the engineering design, procurement, and construction general contract for the central control room in the refinery area (Bid Section 1), are now ready for bidding, and public bidding is being carried out. Estimated contract value for this bid section: 7.5 billion yuan. Scope of the bidding for this section: The foundation engineering design, detailed engineering design, material procurement, construction, operation maintenance, and related technical services for the expansion and renovation of the 1# atmospheric distillation unit with a capacity of 1.5 million tons per year in the refinery area of the Tahe Refining and Chemical Company’s integrated refining and chemical project, including the following works: (1) Construction of a new 3# vacuum distillation unit with a capacity of 5 million tons per year (maximum design pressure of 4.0 MPa, maximum design temperature of 420°C) ; (2) Central control room project for the refinery complex ; (3) Temporary facilities (including utilities such as water, electricity, and steam, communication systems, roads, warehouses, offices, etc.). Source | Sinopec Construction Project Electronic Bidding Platform
Reply #22025-08-30
【Ten Years of Great Development in Chemical Equipment】2641-2025: The world’s largest diesel adsorption and separation unit with a capacity of 2 million tons per year in Guangxi was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5700113-1-1.html (Source: Haichuan Chemical Forum)
Reply #32025-08-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】2643-2025: China Becomes the First Country in the World to Achieve Large-Scale Thermal Recovery of Heavy Oil at Sea ** https://bbs.hcbbs.com/thread-5700272-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-08-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】2643-2025: China Becomes the First Country in the World to Achieve Large-Scale Thermal Recovery of Heavy Oil at Sea ** https://bbs.hcbbs.com/thread-5700272-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-08-31
【Ten Years of Rapid Development in Chemical Processing Equipment】2618-2025: Bridging Domestic Technology Gaps; First domestic development of TDI railway tank containers successful https://bbs.hcbbs.com/thread-5698801-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.