Thread Content
On October 14, China Coal Heilongjiang Coal Chemical (Group) Co., Ltd. issued a tender for feasibility study technical services related to the Jixian wind, hydrogen, storage and alcohol integration project. Inquirer: China Coal Heilongjiang Coal Chemical (Group) Co., Ltd. Project name: Feasibility study technical services for the Jixian wind, storage, hydrogen, and green alcohol integration project. Project location: Dalianhe Town, Yilan County, Heilongjiang Province. In July, an announcement was made regarding the award of technical services for the feasibility study report of China Coal Heilongjiang Coal Chemical (Group) Co., Ltd.’s 200,000 tons per year biomass-based green alcohol production project. Seller: Guangzhou Institute of Energy, Chinese Academy of Sciences. In addition, China Coal Group is advancing 2 green methanol and 2 green ammonia projects: 1. The integrated wind and solar hydrogen production project in Linxi County by China Coal Group. On July 7, the green methanol component of the first phase of this project, as well as the hydrogen production component of the same first phase, were approved for implementation. The total investment for the project is 1,664,447,700 yuan. The China National Coal Group Linxi Wind-Solar Hydrogen Production Integration Project (Phase I, Green Methanol Component) is located in Chifeng City, Linxi County, within the Chifeng Linxi Industrial Park. The total investment amounts to 1,146,467,700 yuan. The project owner is China Coal (Linxi) Bioenergy Co., Ltd. Construction contents: The total construction area is 80,658㎡, including a comprehensive building, a central control room, a central laboratory building, warehouses, a methanol finished product storage area, a vehicle loading station, a maintenance workshop, a chemical storage facility, and other supporting auxiliary facilities. A new methanol production line has been built, enabling an annual production capacity of 100,000 tons of green methanol. Planned construction period: July 2025 to July 2027. Announcement on the completion of the preparation of the «Feasibility Study Report» for the China Coal Linxi Wind-Solar Hydrogen Production coupled with Biomass-based Green Methanol Demonstration Project. Seller: Hualu Engineering Technology Co., Ltd. 2. China Coal’s 100,000-ton liquid sunlight project: China Coal Ordos Energy Chemical Co., Ltd.’s 100,000-ton liquid sunlight project involves using renewable energy sources such as wind and solar power to produce green hydrogen; this green hydrogen is then used to synthesize methanol together with CO2 recovered from the exhaust gases emitted by existing facilities. The project consists of units for 625MW of wind and solar renewable energy generation, 21,000 tons per year of hydrogen production via water electrolysis, 100,000 tons per year of methanol production from carbon dioxide and green hydrogen (including carbon dioxide capture and purification), as well as auxiliary facilities. On the morning of March 24, 2025, a grand groundbreaking ceremony was held for the 100,000-ton liquid solar energy auxiliary project at China Coal Enerchemical, which is under the EPC general contracting of Saiding Company of China Chemical. On July 13, the main structure of the methanol cabinet room for the Liquid Sun project at China Coal Hubei Energy Chemical Company was completed, marking a milestone in the project’s development. 3. China Coal Green Energy’s integrated wind-solar hydrogen production project in Wushen Banner: On May 29, 2025, the ammonia synthesis facility associated with this integrated wind-solar hydrogen production project carried out by China Coal Green Energy (Ordos) Energy Technology Co., Ltd. was approved for implementation. The project is funded by China Coal Green Energy (Ordos) Energy Technology Co., Ltd., and it is being constructed in the Tuk Industrial Park of the Sulihe Economic Development Zone in Wushen Banner, Ordos City. The total investment in the project is 2.846 billion yuan; it has an annual production capacity of 500,000 tons of green ammonia, with an ammonia synthesis plant capacity of 2,216 MTPD. Corresponding auxiliary and supporting facilities are also built as part of this project. The project is planned to start construction in October 2025 and be completed by September 2027. 4. China Coal Green Energy Siping New Energy Hydrogen Production and Ammonia Synthesis Project: On March 21, 2025, the China Coal Green Energy Siping New Energy Hydrogen Production and Ammonia Synthesis Project was registered. The project owner is China Coal Green Energy Technology (Beijing) Co., Ltd., located in the Siping New Industrialization Economic Development Zone in Siping City, Jilin Province. The total investment for this project is 2,916.91 million yuan; construction is scheduled to begin in December 2025 and to be completed by December 2027. The total hydrogen production capacity of the project is 75,200 Nm³/h, comprising 73 ALK electrolyzers with a capacity of 1,000 Nm³/h each and 11 PEM electrolyzers with a capacity of 200 Nm³/h each ; The nitrogen production capacity of the air separation unit is 20,000 Nm³/h ; It is equipped with 4 pressure storage tanks for liquid ammonia at room temperature, each with a capacity of 2000 m³, as well as 24 hydrogen gas storage tanks, also with a capacity of 2000 m³ each. The annual ammonia production capacity is 122,000 tons.