【Haichuan EPC】What are the key points for controlling design costs?

2025-11-08View Original

Thread Content

(3) Control of design costs ① Set objectives: Based on the principle of optimal cost-performance, multiple options are compared with the preliminary design estimate as the upper limit. ②Cost target breakdown: Establish a CBS control table for cost target breakdown. ③Before the preparation of the construction drawings, a technical and economic analysis is conducted on factors that have a significant impact on costs, such as equipment selection, building structure types, and material choices. Only after these requirements are met is the drawing design commenced. ④Compare the actual design costs, workload, and the set limits; if the design exceeds these limits, carry out design optimization. If optimization is not possible, seek clarification and update the design estimate after approval. ⑤Referring to value engineering analysis, the analysis should primarily focus on systems involving large investment amounts (such as equipment with complex structures, great size or weight, expensive raw materials, or special performance characteristics; or individual units with high costs). For example, in terms of controlling overdesign: originally, a piece of equipment weighed 15 tons; after certain processing steps, its weight increased to 19 tons. To ensure safety, the design of its foundation might be adjusted so that it can support up to 25 tons. Such incremental increases must be avoided. ⑥Issues such as the land area required for equipment layout, pipeline routing, and safe production all have an impact on the scale of investment. Based on feasibility analysis, it is necessary to compare the construction costs of various layout schemes in order to select the optimal one. ⑦Among the imported foreign process patent technology projects, patent holders often recommend the use of imported equipment. However, such equipment is expensive; therefore, designers need to thoroughly understand the technical specifications and performance requirements of these products, as well as the intentions behind them, in order to determine whether it is possible to manufacture them domestically and thus reduce investment and maintenance costs. ⑧Control design changes; design changes do not include those resulting from additional requirements from the owner or external factors. (4) Design completion: During the completion phase, the design manager and the responsible persons for various specialties must, in addition to submitting the design documents as required by the contract, also prepare all the relevant documents needed to close out the contract. Based on the drawings, documents, and relevant records, organize the preparation of a master index for the project design documents and archive it. Conduct a comparative analysis of the archived construction drawing budget and the estimated cost control to identify areas where savings have been achieved or where costs have exceeded the estimates, analyze the reasons behind this, and accumulate experience or develop improvement measures. The design manager organizes the preparation of the design completion report, participates in the compilation of the project completion report, and provides feedback on experiences and lessons learned. The focus is on summarizing lessons learned, the chaotic aspects of the management process, and cost control efforts.
Reply #22025-11-08
【Ten Years of Rapid Development in Chemical Equipment】The key technology project for \"converting coal into high-end carbon materials\" carried out by Zhaoqing Shunxin from 2005 to 2025 has passed the evaluation process. https://bbs.hcbbs.com/thread-5704595-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-11-09
【Ten Years of Great Development in Chemical Engineering Equipment】 From 2806 to 2025, the Dalian Institute of Chemical Physics’s “New fixed-bed process for the hydroxylation of phenol with hydrogen peroxide to produce hydroquinone” has passed the evaluation of scientific and technological achievements. https://bbs.hcbbs.com/thread-5704724-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #42025-11-09
【Ten Years of Great Development in Chemical Engineering Equipment】 From 2806 to 2025, the Dalian Institute of Chemical Physics’s “New fixed-bed process for the hydroxylation of phenol with hydrogen peroxide to produce hydroquinone” has passed the evaluation of scientific and technological achievements. https://bbs.hcbbs.com/thread-5704724-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #52025-11-09
【Ten Years of Great Development in Chemical Engineering Equipment】 From 2806 to 2025, the Dalian Institute of Chemical Physics’s “New fixed-bed process for the hydroxylation of phenol with hydrogen peroxide to produce hydroquinone” has passed the evaluation of scientific and technological achievements. https://bbs.hcbbs.com/thread-5704724-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #62025-11-09
【Ten Years of Rapid Development in Chemical Equipment】2791-2025: Fuda Zijin Hydrogen Energy unveils China’s first 1,000-kilogram-class commercial ammonia decomposition hydrogen production and hydrogen refueling station https://bbs.hcbbs.com/thread-5704209-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】2796-2025: Construction Management of Ethylene Process Piping Projects at Huanqiu Liu Jian’s Tarim Project Site – Completion of All Tasks https://bbs.hcbbs.com/thread-5704422-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-11-10
【Ten Years of Great Development in Chemical Engineering Equipment】 From 2806 to 2025, the Dalian Institute of Chemical Physics’s “New fixed-bed process for the hydroxylation of phenol with hydrogen peroxide to produce hydroquinone” has passed the evaluation of scientific and technological achievements. https://bbs.hcbbs.com/thread-5704724-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #92025-11-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2809-2025**The high-temperature and high-pressure slurry feed pump systems developed by the Energy Group won the first prize in the 2025 “Mechanical Industry Science and Technology Award”. https://bbs.hcbbs.com/thread-5704776-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #102025-11-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】The fuel supply system project for the II Chemical Construction South Pole Ross Sea hub has officially entered the phase of actual construction. https://bbs.hcbbs.com/thread-5704834-1-1.html (Source: Haichuan Chemical Forum)
Reply #112025-11-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful First Operation of the Pilot Plant for Producing Liquid Fuels via Hydrogenation of High-Temperature Coal Tar, 2813–2025, Qingdao Institute of Energy, Chinese Academy of Sciences https://bbs.hcbbs.com/thread-5704913-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.