The 30% scale model of the process engineering for Jiangsu’s LNG expansion tank project passed approval in Chengdu

2025-12-13View Original

Thread Content

On December 12, the 30% scale model of the process engineering for Jiangsu’s LNG expansion tank project, undertaken by the Southwest Branch, passed the review in Chengdu, laying a foundation for the smooth progress of the project design. Before the review, the Southwest Branch organized technical experts to conduct on-site inspections and discussions on multiple occasions, as well as held specialized exchanges on cold energy generation, thereby creating favorable conditions for the review of the 30% model. During the review process, the Southwest Branch gave a dedicated presentation on the 30% scale model of the process engineering, focusing on aspects such as the layout of process units, the integration of existing units with other sections of the project, the routing and stress loads of newly built or modified pipelines, the arrangement of pipe racks in utility tunnels, instrument and communication cable trays, and ergonomics ; The expert group conducted a detailed discussion of the model in accordance with the sequence of the manufacturing process. After 3 days of thorough review, the group unanimously agreed to approve it. Relevant responsible officials from CNPC Jiangsu LNG Co., Ltd., Beijing Xingyou Project Management Company, Huanqiu Engineering Company, Pipeline Bureau Engineering Company, CPECC Southwest Branch, and other entities, as well as members of the project team, attended the meeting.
Reply #22025-12-13
The Jiangsu LNG receiving station is a key project in the development of the natural gas production, supply, storage, and distribution infrastructure. It is also an important strategic initiative for Jiangsu Province to enhance its gas supply capabilities and the reliability of natural gas power generation and supply by leveraging coastal LNG receiving stations. The Jiangsu LNG expansion tank project is an important part of the Jiangsu LNG receiving station, and it consists of process engineering, hydraulic engineering, tank engineering, and export pipeline engineering. On August 26, 2025, the Southwest Branch, as the leading member of the consortium, won the bid for the general contracting of the process engineering work. It was also responsible for overseeing all four contract packages, including organizing the development of unified project design guidelines, coordinating the design schedule and managing the technical requirements related to the project, ensuring the integrity, quality, and adequacy of the overall design, and coordinating with the EPC contractors for the other contract packages regarding detailed design and project commissioning. After winning the bid for the project, the Southwest Branch made careful plans, detailed the tasks, and worked closely with the consortium partners. It organized on-site inspections, held discussions on technical aspects, and carried out internal reviews of the design plans – all in order to complete the design milestones on time and to high quality, thus laying a solid foundation for the further progress of the project.
Reply #32025-12-13
【Haichuan Chemical Technology Documentation】How are the design temperature and design pressure of equipment and pipelines determined? https://bbs.hcbbs.com/thread-5708207-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2895-2025: The Sixth Academy of Aerospace Engineering built China’s first commercial liquid hydrogen refueling station, which was officially put into operation in Panzhihua. https://bbs.hcbbs.com/thread-5708004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-15
【Ten Years of Rapid Development in Chemical Processing Equipment】2899-2025: Hengyang Valin Steel Pipe collaborates with Danielei to build the world’s largest hot continuous rolling line for seamless steel pipes https://bbs.hcbbs.com/thread-5708317-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2900 to 2025: Beijing Aerospace Power Research Institute developed China’s first polyolefin crushing and feeding machine, which has been in operation at a polyolefin plant in Tianjin for over 30 days. https://bbs.hcbbs.com/thread-5708326-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-15
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82025-12-16
The 【Haichuan Equipment Guessing】 series will continue to be updated in 2027 – all Haichuan fans are welcome to participate actively! https://bbs.hcbbs.com/thread-2079686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92025-12-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.