Thread Content
On January 26, 2026, the Tendering Department of the Procurement Center of Inner Mongolia Guangna Coal Industry (Group) Co., Ltd. issued a notice. In accordance with the \"Law of the People’s Republic of China on Bidding and Tendering\" and relevant laws and regulations, and in line with the principles of openness, fairness, impartiality, and good faith, Wuhai Guangjin New Materials Co., Ltd. is conducting a public domestic bidding process for the acetylene off-gas recovery unit project as part of the BDO-PBAT integrated project (Phase I). Enterprises in the industry are warmly invited to submit bids. I. Basic Information: 1. Tenderer: Wuhai Guangjin New Materials Co., Ltd ; 2. Location of construction: Within the project area of Wuhai Guangjin New Materials Co., Ltd., in the Low-Carbon Industrial Park of Wuhai Economic Development Zone ; 3. Subject matter: Acetylene tail gas recovery unit for the BDO-PBAT integration project (Phase I) of Wuhai Guangjin New Materials Co., Ltd ; 4. Tender number: ZB-GJX-BDO-GF-445. Project overview: This project follows the EP+C model. The bidder is responsible for the design, supply, construction, commissioning, personnel training of the acetylene off-gas recovery unit, up to its successful commissioning and acceptance. This includes, but is not limited to, the design, supply, construction, commissioning, and personnel training for all areas such as processes, equipment, pipelines, electrical systems, instrumentation, control systems, communications, lighting, insulation, and corrosion protection, up to the point of successful operation acceptance. C is quoted separately. The boundary of this unit extends from the flange at the inlet end of the first shut-off valve of the feed unit, to the flange at the outlet end of the last shut-off valve of all outlets (including but not limited to steam, circulating water, deionized water, chilled water, process water, nitrogen, compressed air, instrument air, alkali solution, waste liquid, waste gas, process gas, etc.).
【Ten Years of Rapid Development in Chemical Equipment】Successful first trial run of the high-pressure carbon dioxide compressor for CCS units at Shaanxi Gas Group from 2023 to 2026 https://bbs.hcbbs.com/thread-5712362-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest VOCs treatment facility for coal chemical industries was put into operation at Zhongyuan Dahua from 2994 to 2026. https://bbs.hcbbs.com/thread-5712394-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2996-2026 – Amazing! ! The CNPC First Construction Team completed the welding of the first weld on the diagnostic shielding module for the International Thermonuclear Fusion Experimental Reactor ITER project. https://bbs.hcbbs.com/thread-5712416-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2997 to 2026: Domestic high-performance carbon fiber ZA55GC enters the core supply chain of domestic commercial aircraft https://bbs.hcbbs.com/thread-5712466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2997 to 2026: Domestic high-performance carbon fiber ZA55GC enters the core supply chain of domestic commercial aircraft https://bbs.hcbbs.com/thread-5712466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Key technologies for the efficient co-production of synthetic ammonia and LNG from smokeless pulverized coal, 2989–2026, have been approved for use. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712191 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2987 to 2026, Weifang Gaomi Haomai delivered multi-axis centrifugal compressors capable of handling 180,000 standard cubic meters of air. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712097 (Source: Hchuan Chemical Forum (Hchuanliu hcbbs))
【Ten Years of Great Development in Chemical Equipment】From 2999 to 2026, the world’s first 3,000-ton-class OMB pulverized coal pressurized gasifier at Lunan Chemical has been operating continuously, safely, and stably for over 350 days. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712515 (Source: Haichuan Chemical Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))