Thread Content
On April 15, an invitation for tender was issued for the preliminary design of the CGN New Energy integrated wind and solar hydrogen production project in Balin Left Banner, Inner Mongolia. This project is the CGN Balin Zuoqi integrated wind and solar hydrogen production project, which includes components such as a wind farm, a hydrogen production plant, interconnection lines, and transmission systems. The wind power generation capacity is 500MW, while the hydrogen production facility’s capacity is 46,000 Nm³/h. Bidding content and scope: including but not limited to: topographic surveying ; Detailed engineering geological surveys of each turbine site in the wind farm, the routes of the collection lines, and the location of the step-up substation, as well as the engineering geology of the hydrogen production station ; Design of roads in hydrogen production stations and wind farm areas ; Design of fan foundation and box substation foundation ; Substation design (220kV) ; Design of on-site power collection circuits ; Design of hydrogen production stations, etc. Design timeline and requirements for submitted deliverables: The preliminary design work shall be completed within 20 working days. Bidders are allowed to submit bids in a consortium format for this tender, but it is necessary to designate the project manager for this work, that is, the leading design agency. Bidders must hold certifications under the ISO9000, ISO14000, ISO45000 series, or equivalent quality, environmental, and occupational health and safety management system certifications.
【Ten Years of Rapid Development in Chemical Equipment】The Haimang Hydrogen Energy Ningdong Organic Liquid Hydrogen Storage Materials Facility began trial production in 203088–2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718001 (Source: Hachuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Haichuan Equipment Guessing Game】What is tied to the pipe? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718037 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】Successful one-time commissioning of the world’s first upgraded process for producing ethylene glycol from light hydrocarbons in Lianyungang, 3085–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
【HaiChuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3087-2026: China’s first offshore mobile multi-functional platform, “Zengchan No.1”, was delivered https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718136 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】3088-2026: China’s first pilot project for producing high-quality synthetic crude oil using green hydrogen in combination with low-quality heavy oil has been launched. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718140 (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The gas supply for automated instruments is connected to the instruments without being filtered or regulated first. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718231 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Common Issues in Haichuan Pipeline Design】Selection of hoses and valves at the utility material hose stations, as well as details regarding piping and installation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718254 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – No Toxic Gas Detectors Installed at the Sampling Points of Formaldehyde Production Units https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718279 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest opening size – 8.6 meters: Technical validation completed for complete sets of molten salt tank-type heat collectors and related processes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718280 (Source: Haichuan Chemical Engineering Forum (HCBBS))