HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Topic】【Civil Engineering Version 20170113】

2017-01-13View Original

Thread Content

This post was last edited by hesonchang214 on 2017-1-13 10:01. Reward for participation: 2 wealth points. Proper compensation: Both the FIDIC contract conditions and China’s \"Model Text for Construction Contracts\" (GF—99—0201) stipulate that the contractor must submit a detailed claim document along with relevant information to the engineer within ( ) days after sending a notice of intent to claim, or within any other reasonable time period approved by the engineer.   A.7 B.14 C.21 D.28 Reference**: D
Reply #22017-01-13
Both the FIDIC Conditions of Contract and China’s \"Model Text for Construction Contracts\" (GF—99—0201) stipulate that the contractor must submit a detailed claim document along with relevant information to the engineer within (D) days after sending the notice of intention to claim, or within any other reasonable time approved by the engineer.   A.7 B.14 C.21 D.28

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.