May I ask whether the pipe supports for insulated pipes are installed first and then the insulation is applied? ?

2017-06-22View Original

Thread Content

May I ask whether the pipe supports for insulated pipes are installed first and then the insulation is applied? ? When the pipe slides, will the insulation layer pose a hindrance to the pipe support? ? Do the pipeline and insulation slide together? ? Looking forward to your advice
Reply #22017-06-22
I’m only talking about what I’ve encountered: the pipe supports for insulated pipes are welded to the pipelines; they are installed first, and after passing inspection, insulation is applied last. When the pipeline moves, the pipe supports move along with it; this has little to do with insulation. . .
Reply #32017-06-22
Pipe supports fall under the category of pipe hangers and brackets; you must install those first before proceeding with the insulation work. Additionally, for the second floor, pipe clamp-type supports do not need to be welded to the pipes
Reply #42017-06-22
Of course, the first thing is to prepare the pipe supports; otherwise, even if insulation is done well, how can it work?
Reply #52017-06-22
The insulated pipe supports are welded to the pipes; the pipe supports are installed and welded first, followed by insulation. The heat-insulating pipe supports are placed outside the insulation layer; the pipe supports are installed after insulation is applied.
Reply #62017-06-22
This post was last edited by Liu Qinfen on 2017-6-23 08:58. Please send a picture of the on-site cooling pipe support
Reply #72017-06-22
If the pipe support does not need to be welded to the pipe, then an insulation layer is required between the pipe support or pipe clamp, which provides better thermal insulation. If it needs to be welded to the pipe, then the pipe supports must be installed first, followed by the insulation layer. It’s similar to the diagram on floor 7; it’s very intuitive.
Reply #82017-06-23
The pipe supports for the pipes are welded to the pipelines; they are installed first, and after passing inspection, insulation is applied. Additionally, it should be considered whether the insulation layer will pose any obstacles to the pipe supports, as they move as a whole, unless the welds holding the supports in place are weak and the supports come loose. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.