【JST-068】One-on-one consultation office for nitrogen fertilizer technology experts

2012-09-02View Original

Thread Content

This post was last edited by Firefly on 2015-4-10 08:42. Online schedule: irregular. Profession: 3 years of experience in chemical processing machinery, 9 years in urea production processes. Specialization: diagnosis, resolution, and design of common issues related to urea production using carbon dioxide stripping; I will share with you everything I know on these topics.
Reply #22012-09-02
Thank you for your hard work, experts! We warmly welcome the establishment of this office! Please feel free to ask questions!
Reply #32012-09-02
A warm welcome to the establishment of this office! We have long wanted to set up an office, but we couldn’t find any experts; since I myself am not an expert, I didn’t dare to open one. Now that the office is here, please feel free to come and ask for advice!
Reply #42012-09-02
Let me ask a question first! The original poster has been working in the urea production process for 9 years; have they encountered problems with blockages in the high-pressure cooling system? When we experience a significant reduction in flow here, it feels as though there is a blockage in the high-pressure cooling system; the synthesis pressure rises, and the temperature of the liquid coming out of the stripping tower exceeds 180 degrees. Is this situation related to a blockage in the gas-phase pipes of the high-pressure cooling system? In our facility, the gas-phase pipelines for Gaojia cooling systems suffer from high resistance due to their long length and numerous bends; these pipelines have been blocked for a long time. Is there any harm associated with this situation over time?
Reply #52012-09-05
This post was last edited by 1025199692 on 2012-10-14 06:45. I have never encountered a situation where the high-pressure refrigerant lines were blocked; when such blockages occur, they need to be cleared promptly to prevent too few non-condensable components from reaching the synthesis tower, which could cause changes in the system. Under normal production conditions, as long as the heat retention is proper and the pressure in the low-pressure drum is within normal limits, blockage of the high-pressure ammonium methoxide condenser should not occur.
Reply #62012-09-05
But this is exactly what happens here. According to the original poster’s view: if the air ducts of the high-pressure air conditioner are blocked and cannot be cleared, does that have an impact on the system?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.