HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

7.22-Daily Topic (Pharmaceutical Engineering Technology Edition)

2017-07-22View Original

Thread Content

7.22– Daily Topic (Pharmaceutical Engineering Edition): Those who answer correctly receive 10 wealth points, while those who answer incorrectly receive 3 wealth points. Multiple-choice question: Material balance calculations based on the time unit of “days” involve determining the daily production volume of a product by using its annual production volume and number of production days; then, the amount of material required for one day’s operation is calculated based on the overall yield of the product, and material balance calculations are carried out using this value as a basis. Under normal circumstances, the number of annual production days can be calculated as 【 】 days; in cases of mild or severe corrosion, this figure can be increased or decreased depending on the specific conditions. For processes that are not yet mature or suffer from severe corrosion, the calculation can be done on a 【 】-day basis. A、240 B、280 C、330 D、300c d
Reply #22017-07-22
This post was last edited by Peng Zuosen on 2017-7-22 10:01: C,D

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.