HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Piping Valve Technical Edition – Daily Question on Common Piping Errors】20170818

2017-08-18View Original

Thread Content

Discussion on Common Piping Errors 033: Which of the following designs (for the piping of control valves in saturated steam lines) is correct? A. B. Answer: B. Continuous drainage and blowdown valves are installed at the low point of the control valve on the saturated steam pipeline. Continuous hydrophobic treatment should be installed before the control valve.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.