HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Sloshing solution methods

2017-12-09View Original

Thread Content

There is water hammer in the steam heat exchanger; opening the on-site drain will eliminate the water hammer. Is it due to a backpressure issue?
Reply #22017-12-09
Water hammer should not be underestimated; I read an article about a case in which water vapor-induced water hammer caused a blind plate to crack and fly off. Installing check valves and minimizing the length of dead zones can help alleviate or prevent water hammer.
Reply #32017-12-09
Increase the spacing of the heat exchanger baffle plates and drain water promptly.
Reply #42017-12-13
Add a hydrophobic valve; it doesn’t cost much. Last year, while we were driving, a 4-kilogram pipe burst at the weld site due to water hammer; fortunately, no one was injured!
Reply #52017-12-13
Is it possible that the check valve is clogged, causing poor drainage?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.