HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues with the PFD final document for the process engineering field?

2018-04-23View Original

Thread Content

I would like to ask everyone whether it is necessary to include process PFD files in the final set of construction drawings What are the specific requirements regarding the depth of the material points? Thank you!
Reply #22018-04-24
The PFD is the most straightforward diagram showing the process flow and material balance of the equipment; it’s very important, and I think it’s necessary to keep it on file. Even without explicit provisions, it still has value for storage.
Reply #32018-05-13
Storage is necessary. The more detailed the material information during the design phase, the better, as it allows for a fuller understanding of the safety and hazards associated with the installation on site.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.