HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What is the purpose of the line between the two main flow lines of the raw gas receiving unit? Newbie question

2018-07-13View Original

Thread Content

What is the function of this pipeline: handshake
Reply #22018-07-13
It serves the purpose of balancing the pressure difference before and after the valves on the two main lines. The main pipeline has a pressure of 700, while the two branch pipelines have a pressure of 500. Valves installed in such thick pipelines find it difficult to open when there is pressure at one end; in such cases, the 50-value pilot valve can be opened to reduce the pressure difference before and after the valve, thereby making it easier to open the valve. It can also be used as a drain valve for purging, replacing fluid, or emptying contents
Reply #32018-07-13
:handshake Thank you so much

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.