HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Layout of exhaust gas absorption device

2018-08-28View Original

Thread Content

What specifications should be followed for the exhaust gas treatment systems designed to absorb Class A substances, that is, the absorption tower systems used to handle the exhaust gases emitted during packaging? When the gas concentration is below 5%, what distance is required between such systems and Class A processing equipment?
Reply #22018-08-29
This post was last edited by Hansonwen on 2018-8-29 at 08:42. Currently, there is no clear definition regarding the fire hazard classification of the recovery and treatment equipment used for VOCs. In our institution, we determine the fire hazard level of such equipment based on the fire hazard of the medium being treated; for example, if a Class A medium is being processed, the fire hazard classification of the recovery and treatment equipment is also set as Class A. Even at low concentrations, there is still a risk of combustion and explosion. The layout of the equipment should be determined based on the characteristics of the location in question. If it is located in a tank farm, then the layout of Class A process equipment must comply with both GB50074-2014 \"Code for Design of Oil Depots\" and GB50160-2008 \"Code for Fire Protection Design of Petrochemical Enterprises\", and the stricter of these standards shall be applied. In accordance with Table 4.2.12 of GB50160-2008 \"Code for Fire Protection Design of Petrochemical Enterprises\", the distance between Class A process units should be no less than 30 m (30 m is the specified distance for petrochemical plants; for refining plants, it is 25 m). The distance between a Class A process unit and the outer boundary of the facility should be no less than 25 m, and it should be no less than 35 m from the fire pump room (a Class II critical facility in the plant), as well as no less than 40 m from the office building (also a Class II critical facility in the plant). The above is for reference only; the specific approach still needs to be determined by your company’s layout and process engineering teams

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.