HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Fire separation distance

2018-12-05View Original

Thread Content

Are there any fire separation requirements within the device? What are the requirements for the layout of equipment inside the device?
Reply #22018-12-06
The last edit to this post was made by bfdlwolf on 2018-12-6 at 11:45. The main standards related to the layout of equipment and installations are as follows: 1. Code for Fire Protection Design of Petrochemical Enterprises GB50160-2008; 2. Code for Design of Layout of Petrochemical Process Installations SH 3011-2011; 3. Regulations for Design of Layout of Chemical Plant Equipment HG/T 20546-2009
Reply #32018-12-06
1. \"Code for General Layout Design of Industrial Enterprises\" (GB50187); 2. «Code for General Layout and Transportation Design of Chemical Enterprises» (GB50489) ; 3. Code for Fire Protection Design of Petrochemical Enterprises (GB50160) ; 4. Code for Fire Protection Design of Oil and Gas Engineering Projects (GB50183) ; 5. Code for Fire Protection Design of Buildings (GB50016) ; 6. Code for Design of Oil Storage Tanks (GB50074) ;

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.