HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to choose the fire resistance rating of a building?

2019-01-25View Original

Thread Content

I have a question for everyone: For Class C and Class D buildings, according to the building fire protection codes, a fire resistance rating of level 3 or 4 is sufficient. Then why is it that in structural design, a fire resistance rating of level 2 is usually adopted? What is the reason for this?
Reply #22019-01-25
At the second level, large structures can be built; land resources are limited, so don’t waste them
Reply #32019-02-28
You mentioned that according to GB50016, fire resistance ratings of level 3 or 4 can be chosen, but building plans are usually designed according to level 2 standards, right?
Reply #42019-02-28
The building classification for factories or warehouses in categories C, D, and E can be grade 3 or grade 4. However, there are strict requirements regarding the allowable floor area and number of floors for these grades. For factories in category C, if they are classified as grade 3, they can have only 2 floors; for factories in categories D and E, the maximum number of floors at grade 3 is 3. As for warehouses in category C, those classified as grade 3 can either be single-story or, in some cases, three-story buildings. Warehouses in categories D and E can have up to 3 floors at grade 3. Therefore, in order to increase the building’s floor area or number of floors, it is necessary to raise the fire resistance rating of the building accordingly.
Reply #52019-03-01
Rational allocation of land resources and economic benefits

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.