Class C workshops are equipped with Class A intermediate warehouses

2019-05-08View Original

Thread Content

As the title suggests: Can a Class A intermediate warehouse be installed in a Class C workshop? Of course, the storage volume in Class A warehouses for one day and night should not exceed 5% of the total area. Is this okay?
Reply #22019-05-13
Which one according to? Clause 3.1.2 refers to workshops rather than warehouses when determining the fire classification based on the most hazardous materials. 3.3.6 It is correct that intermediate warehouses can be set up, but once a Class A warehouse is established in a Class C workshop, how should the fire classification be determined?
Reply #32019-05-13
Intermediate warehouses classified as Category A are permitted, and the area of their fire compartments shall not exceed the specified limit for such compartments. The total shall not exceed the area of the fire compartment in the factory building
Reply #42019-12-23
Intermediate warehouses do not affect the assessment of the fire hazard in the factory building
Reply #52019-12-23
Class A intermediate warehouses can be set up. The 5% requirement does not apply to intermediate warehouses; please read Article 3.1.2 of the building codes carefully. The area of the intermediate warehouse should not exceed the area of one fire compartment in the warehouse, and its area should also not exceed the area of one fire compartment in the factory building.
Reply #62019-12-31
In a workshop, the area designated as an intermediate warehouse may account for less than 5%, and this proportion can be determined based on the fire hazard level of the workshop; however, such a warehouse is not allowed
Reply #72020-01-22
Building codes do not allow it. The petrochemical regulations can
Reply #82020-05-16
The building code is the primary standard; if something is not allowed by the building code, then it certainly isn’t allowed by any other supplementary standards either.
Reply #92020-05-18
The current situation is that for new projects, the design agency will definitely refuse to agree (as it does not meet the requirements outlined in clause 3.1.2 of the building codes); However, for a completed project, as long as all aspects of its design meet the requirements, it should be compliant (in accordance with Code for Rock Engineering 6.6.1). There’s nothing to do about it – safety standards these days are all set at their maximum levels!
Reply #102020-08-11
This uses Article 3.1.2 of the Building Code, right?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.