HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

For the pipelines of combustible gases, liquefied hydrocarbons, and combustible liquids in the inlet and outlet devices, isolation valves and 8-shaped... should be installed at the boundaries of the devices.

2019-08-29View Original

Thread Content

What is this isolation valve? Why is Section 7.2.17 added? For the pipelines carrying combustible gases, liquefied hydrocarbons, and combustible liquids at the inlet and outlet of a facility, isolation valves and 8-shaped blind plates should be installed at the boundaries of the facility. A platform should be provided at the location of the isolation valves; such a platform, with a length equal to or greater than 8 meters, should be equipped with ladders in both directions.
Reply #22019-08-30
This valve is called a \"blind plate valve\", an 8-character blind plate valve. To prevent the leakage of hazardous materials, it is necessary to close the isolation valve first, and then close the blind valve. It is mainly established for security purposes.
Reply #32019-08-30
It is Article 7.2.16; Standard interpretation is done for safety reasons. In other words, it enables rapid isolation in the event of an emergency in the pipelines carrying combustible gases, liquefied hydrocarbons, or combustible liquids into the device, thereby preventing more serious issues from occurring. Thank you!
Reply #42019-08-30
It’s just an ordinary cut-off valve; however, it usually consists of two valves along with a blind plate to ensure complete drainage and isolation
Reply #52019-08-30
You’ll understand this when working at large factories; for example, a factory may have several units, and if one of them needs to be shut down for maintenance, all external connections must be severed.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.