HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Spacing between equipment within the device

2022-10-03View Original

Thread Content

Are there any distance requirements regarding the layout spacing between the reboiler of the stripper in the catalytic cracking absorption-stabilization unit, the reboiler of the stabilizer tower, and the tower structures?
Reply #22022-10-09
When determining the spacing between equipment, safety distances must be considered to ensure they meet requirements. For instance, there are specific spacing requirements for the arrangement of storage tanks containing hazardous materials; Secondly, maintenance space must be considered; thirdly, inspection routes and safety passages should be taken into account.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.