Thread Content
Give praise and encouragement to the achievements made in China’s chemical engineering technology and equipment; your participation in discussions is the greatest encouragement. **********************【Ten Years of Great Development in Chemical Engineering Equipment】Regular updates and summaries are available; feel free to join the discussions: https://bbs.hcbbs.com/thread-3576046-1-1.html ***************** On February 8th, Sinopec Petroleum Engineering Research and Testing Technology Co., Ltd. completed its corporate registration, marking the official establishment of Sinopec’s first fully functional pilot testing platform for petroleum engineering. Operated with funding from Sinopec Petroleum Engineering Technology Research Institute Co., Ltd., the company aims to implement the guidelines set out at the Third Plenary Session of the 20th CPC Central Committee regarding the establishment of a number of industry-wide technical platforms. It seeks to accelerate the development of proof-of-concept and pilot-scale testing platforms, facilitate the transition of scientific and technological achievements from the laboratory to production lines for commercialization, foster original technological innovation, improve the quality and reliability of technical products, and contribute to achieving high levels of self-reliance in petroleum engineering technology, thereby supporting the high-quality development of the upstream oil and gas sector. Sinopec Petroleum Engineering Research and Testing Technology Co., Ltd., established in 2025 and located in Dezhou City, Shandong Province, is a company focused on research and experimental development. The registered capital of the company is 100 million RMB.
hg fas fdsa fdsa sdf fasd fdsa
Doing pilot testing is difficult; it’s not the technology, processes, or supporting facilities that are the issue, but rather the lack of a suitable location. Pilot testing is a process for technical verification; without definite data, there can be no project, and without the data required for various approvals, there can be no approval. This creates a paradox of \"which came first, the chicken or the egg\".
【Ten Years of Rapid Development in Chemical Engineering Equipment】Completion of construction of China’s first 2,000-meter-class ultra-deepwater tree system from 2023 to 2025 https://bbs.hcbbs.com/thread-5680214-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】Ignition of the World’s First 30MW-Class Pure Hydrogen Gas Turbine 2024-2024 https://bbs.hcbbs.com/thread-5680261-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first FPSO with post-combustion carbon capture capability, 2028–2025 https://bbs.hcbbs.com/thread-5680351-1-1.html (Source: Haichuan Chemical Industry Forum)