Thread Content
\"Code for Design of Layout of Metal Piping in Petrochemical Industries\" (SH 3012-2011) 7.2.3 Closed-loop sampling shall be adopted for the following media: a) Media that are extremely hazardous or highly hazardous; b) Flammable gases of Class A; c) Liquefied hydrocarbons.
【Common Issues in Haichuan Pipeline Design】--The often-overlooked requirements for setting safety valve drain holes https://bbs.hcbbs.com/thread-5703311-1-1.html (Source: Haichuan Chemical Industry Forum)
【Common Issues in Haichuan Pipeline Design】--Setting of vent and drain ports in pipeline design https://bbs.hcbbs.com/thread-5703312-1-1.html (Source: Haichuan Chemical Industry Forum)
【Common Issues in Haichuan Pipeline Design】--Don’t forget to design safety protection measures at the flanges of acid and alkali pipelines https://bbs.hcbbs.com/thread-5703315-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】2743-2025: Industrialization breakthrough of furan hydrogenation refining catalysts at Hyosung Chemical, by China National Research Institute of Chemistry https://bbs.hcbbs.com/thread-5703034-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】Successful Industrial Application of Hydrolysis-Resistant PBT Catalyst Developed by Sinopec Shanghai Research Institute from 2025 to 2035 https://bbs.hcbbs.com/thread-5703070-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】Successful Industrial Application of Hydrolysis-Resistant PBT Catalyst Developed by Sinopec Shanghai Research Institute from 2025 to 2035 https://bbs.hcbbs.com/thread-5703070-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】2749–2025: China’s largest-pipe diameter cracking gas valves – The 60-inch ultra-large-diameter cracking gas valves used at Tianjin Nangang Ethylene Plant have passed industrial application tests. https://bbs.hcbbs.com/thread-5703102-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2751-2025 Three Gorges Group project for the development and application demonstration of large-scale compressed air energy storage systems and related key equipment has successfully started generating electricity. https://bbs.hcbbs.com/thread-5703150-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】The 3000HP five-cylinder pump intelligent operation and maintenance system, independently developed by Lansi Equipment Company, was completed and tested between 2025 and 2752. https://bbs.hcbbs.com/thread-5703151-1-1.html (Source: Haichuan Chemical Industry Forum)