HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Public announcement on the environmental impact assessment for the LDPE/EVA pilot plant of China National Petroleum Corporation’s Dushanzi Petrochemical Company

2026-01-23View Original

Thread Content

On January 21, the Xinjiang Ecology and Environment Protection Industry Association issued a notice announcing the first public disclosure of information regarding the environmental impact assessment for the LDPE/EVA pilot plant project of China National Petroleum Corporation’s Dushanzi Petrochemical Company. Project Name: LDPE/EVA Pilot Plant Project of CNPC Dushanzi Petrochemical Company
Construction Location: Within the Shangku Comprehensive Industrial Park in Bayingolin Mongol Autonomous Prefecture, Xinjiang Uygur Autonomous Region, adjacent to the (ethylene) plant of Tarim Petrochemical Branch of CNPC. Project Overview: This is a new construction project. The main construction contents and scale include: the construction of one set of LDPE/EVA pilot-scale production unit with a capacity of 710 kg/h, along with supporting facilities such as automatic control systems, communication systems, power supply and distribution systems, fire protection systems, and roads.
Reply #22026-01-23
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-01-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982–2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-01-24
【Ten Years of Rapid Development in Chemical Equipment】2974–2026: China Achieves Full Domestic Production in ABS Technology and Related Equipment https://bbs.hcbbs.com/thread-5711312-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #52026-01-24
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035: The first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, has been successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62026-01-24
【Ten Years of Rapid Development in Chemical Equipment】From 2983 to 2026: Jiading, Jiangsu built the world’s largest 30,000-cubic-meter land-based liquefied petroleum gas storage tank, which was shipped overseas https://bbs.hcbbs.com/thread-5712041-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #72026-01-25
【Ten Years of Rapid Development in Chemical Equipment】From 2983 to 2026: Jiading, Jiangsu built the world’s largest 30,000-cubic-meter land-based liquefied petroleum gas storage tank, which was shipped overseas https://bbs.hcbbs.com/thread-5712041-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #82026-01-25
【Ten Years of Rapid Development in Chemical Processing Equipment】2984-2026: Domestic production and application of rotary valves, key components in aromatic hydrocarbon adsorption and separation units at Shanghai Petrochemical Company https://bbs.hcbbs.com/thread-5712074-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-01-26
【Ten Years of Rapid Development in Chemical Equipment】From 2987 to 2026, Weifang Gaomi Haomai delivered multi-axis centrifugal compressors capable of handling 180,000 standard cubic meters of air. https://bbs.hcbbs.com/thread-5712097-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #102026-01-26
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial production facility for the polyphase hydroformylation of ethylene using single-atom catalysts was put into operation between 2017 and 2020. https://bbs.hcbbs.com/thread-5711445-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-01-26
【Ten Years of Rapid Development in Chemical Processing Equipment】2960–2025: China’s largest single-scale project for zero discharge of high-salinity wastewater – The first phase of the Jinchuan Nickel-Cobalt Heavy Metal High-Salinity Wastewater Zero-Discharge Treatment Project comes online https://bbs.hcbbs.com/thread-5710636-1-1.html (Source: HCBBS Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.