HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Interference between the level gauge fork and the equipment’s NPS fitting

2017-06-10View Original

Thread Content

The level gauge fork interferes with the NPS piping of the heat exchanger equipment – how to deal with this? The straight section of Equipment NPS is 24.5, and it shrinks to 22.88 after welding; the diameter of the level gauge’s fork is 22.8. Which party is responsible? How to repair the level gauge fork and heat exchanger equipment to address this issue?
Reply #22017-06-10
Needless to say, it’s a problem with the heat exchanger manufacturers – issues such as weld beads appearing on the inner wall after pipe fitting welding. Ordinary equipment can be cut off and rewelded to ensure a smooth interior surface of the pipe fitting.
Reply #32017-06-12
I disagree; it’s a problem with the heat exchanger manufacturer – there are no weld beads on the inner wall after welding

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.