Is it considered a violation to carry out automatic control design for high-level processes without relying on HAZOP analysis as a basis? Could there be any liability associated with this?
Reply #22018-03-27
Are there any specific regulations requiring this?
Reply #32018-03-27
“Notice of the State Administration of Work Safety and the Ministry of Housing and Urban-Rural Development on Further Strengthening the Safety Design Management for Hazardous Chemicals Construction Projects” (An Jian Zong Guan San [2013] No. 76). II. Effectively implement the responsibilities for safety management of construction projects. (III) The project owner shall entrust a design unit that possesses the required qualification level to carry out the engineering design for the project, and shall apply legally for a safety review of the project as well as handle the relevant procedures. For construction projects subject to engineering supervision, the supervision of safe construction quality should also be entrusted. The project owner should, in the design contract for the construction project, actively request the design firm to conduct a Hazard and Operability (HAZOP) study, and assign personnel with experience in production operations to participate in this review as well as to examine the HAZOP report. For construction projects involving \"two key aspects, one major aspect\" and first-time industrial design, a HAZOP analysis must be conducted during the basic design phase. III. Strengthening the management of the safety design process (9) Design agencies should enhance the analysis of safety risks associated with construction projects, and actively employ methods such as HAZOP analysis for internal safety design reviews.
Reply #42018-04-12
Normally, it should be the process engineering team that submits a request to the control engineering team; the control engineering team then carries out the design based on that request. After the preliminary design is completed, a HAZOP analysis agency conducts a HAZOP analysis of the PID diagrams in the preliminary design documents, proposes corrective measures, and modifies the design documents accordingly

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.