HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

One set of the system costs around 1,000 points; how is the fixed price calculated?

2018-05-16View Original

Thread Content

I built a system worth around 1,000 points: 2 engineer stations and 5 operator stations. There are many sequential control and interlock functions, which makes debugging difficult. How should the cost be calculated for such a large scale? I’m not sure how to determine the expenses when checking the relevant rates – could everyone give some advice?
Reply #22018-05-16
First, the workload needs to be sorted out, such as the amount of cable to be laid, the number of configuration points, and the number of branch stores. Debugging a certain number of analog and digital circuits, etc., cannot be explained in just a few words; what matters is the volume of work involved. The more detailed the information provided on a given day, the easier it is to use the relevant pricing standards, which in turn provides a basis for calculating costs later on
Reply #32018-05-16
Okay, thank you. Is there any reference available?
Reply #42018-06-22
The maintenance quota serves as the basis for budgeting and settlement

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.