The cables at the top of the elevated torch are laid vertically through conduit tubes; to prevent excessive weight on the cables, do they need to be bent somewhere along the way? How far does one need to go before turning? Are there any relevant standards?
Reply #22018-06-29
This problem can be solved by using trough boxes for installation, adding a fixing bracket every two to three meters, and tying the cables to those brackets with wires.
Reply #32018-06-29
Over 100 meters high; it seems that galvanized pipes are being used everywhere
Reply #42018-07-04
It’s an exaggeration to use a platform every two or three meters; for towers over 100 meters tall, about 15 meters is sufficient

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.