Process Engineering Division – Instrumentation and Automation Section – Daily Question – Question from 2020-09-25: Discussion question: 246. What precautions should be taken when using external float level gauges during shutdown and line cleaning?
Reply #22020-09-25
Points to note for external float level gauges during shutdown line cleaning: The valves at the liquid and gas phases should be closed before cleaning, to prevent pressure buildup from damaging the external float level gauge.
Reply #32020-09-25
Before line cleaning, the liquid and gas inlet valves at the base should be closed to prevent pressure buildup from damaging the level gauge of the external float tank during the cleaning process.
Reply #42020-09-25
Before line cleaning, the liquid and gas inlet valves at the base should be closed to prevent pressure buildup from damaging the level gauge of the external float tank during the cleaning process.
Reply #52020-09-25
Points to note for external float level gauges during shutdown line cleaning: The valves at the liquid and gas phases should be closed before cleaning, to prevent pressure buildup from damaging the external float level gauge.
Reply #62020-09-25
Before line cleaning, the liquid and gas inlet valves at the base should be closed to prevent pressure buildup from damaging the level gauge of the external float tank during the cleaning process.
Reply #72020-09-26
Points to note for external float level gauges during shutdown line cleaning: The valves at the liquid and gas phases should be closed before cleaning, to prevent pressure buildup from damaging the external float level gauge.
Reply #82020-09-26
Before line cleaning, the liquid and gas inlet valves at the base should be closed to prevent pressure buildup from damaging the level gauge of the external float tank during the cleaning process.
Reply #92020-09-26
Before performing line cleaning, the valves at the liquid and gas phases should be closed to prevent pressure buildup from damaging the level gauge of the external floating tank during the cleaning process
Reply #102020-09-26
1. Close the root valve. 2. If heating is available, make sure to check that it has been turned off; if heating is no longer possible, vent the material to prevent freezing on the surface.
Reply #112020-09-26
Close the root valve and open the drain valve to completely discharge the material

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.