HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Three-input control for hazardous waste incineration boilers

2019-06-26View Original

Thread Content

At present, the boiler in our company has a rated evaporation capacity of 20 T/h and a pressure of 1.6 MPa. There are issues with the three-way control system, and the control performance is not satisfactory; we seek assistance
Reply #22019-06-27
Please explain what the specific problem is, so that everyone can discuss it together and come up with different solutions.
Reply #32019-06-27
Could you describe in detail what the situation is now? Is there a false liquid level, or what’s going on?
Reply #42019-06-27
Three impulses: three monks have too many ideas, and as a result there’s no water for them to drink. If it doesn’t work, adjust it slowly. Try different settings; failure is part of the process toward success. Those who come after others often end up in positions of power. There are many engineers in chemical plants – be patient, and try to please your stepmother by making adjustments. One day, things will get sorted out somehow. :lol
Reply #52019-06-27
What is three impulses? Is it PID control?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.