HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

One Question per Day 2018.2.27

2018-02-27View Original

Thread Content

The purpose of filling nitrogen between the oxygen cut-off valves after shutting down the furnace is to ( ). A. Prevent oxygen from leaking in B. Facilitate the operation of the shut-off valve C. Fill the vaporizer with nitrogen Answer: A
Reply #22018-02-27
The purpose of filling nitrogen between the oxygen cut-off valves after shutting down the furnace is (a). A. Prevent oxygen from leaking in B. Facilitate the operation of the shut-off valve C. Fill the vaporizer with nitrogen Answer: a
Reply #32018-02-27
The purpose of filling nitrogen between the oxygen cut-off valves after shutting down the furnace is (A). A. Prevent oxygen from leaking in B. Facilitate the operation of the shut-off valve C. Fill the vaporizer with nitrogen

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.