Regarding the issue of simultaneous feeding from a single nozzle for Texaco water-coal slurry

2018-07-13View Original

Thread Content

I would like to ask the experts: In Texaco’s single-nozzle coal water slurry gasification process, continuous operation is required without replacing the process burners. How do plants maintain the furnace temperature after shutting down? How many attempts have been made at the lowest continuous pouring temperature? Replace or not? Should the low-flow purge be turned off?
Reply #22018-07-15
Liantou needs to ensure proper coordination, with the furnace temperature kept at no less than 950 degrees!
Reply #32018-07-16
Try to minimize the introduction of other low-temperature gases; the minimum temperature should be 950°C, and replacement is required when adding materials

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.