HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Model review meeting for Jinhua furnace gasification unit of Zhejiang Jinju Chemical held

2020-12-11View Original

Thread Content

Meeting on the Model Review of Jinhua Furnace Gasification Unit at Zhejiang Jinju Chemical Industry was held / Author/Source: Jinhua Furnace Date: 12-11-2020 Clicks: 3 On December 10, 2020, a meeting on the model review of the synthetic ammonia feedstock route and energy-saving and emission-reduction technology upgrade project at Zhejiang Jinju Chemical Industry Co., Ltd. was held at Hualu Engineering Technology Co., Ltd. Relevant technical personnel from Zhejiang Jinju Chemical Co., Ltd., Hualu Engineering Technology Co., Ltd., and Beijing Qingchuang Jinhua Technology Co., Ltd. attended this review meeting. During the meeting, the participants conducted thorough discussions on various aspects such as the process flow, equipment, piping and valve layout, instrumentation, electrical systems, and safety, and carried out a rigorous review and optimization of the plant model. The synthetic ammonia feedstock route and energy-saving and emission-reduction technology upgrade project of Zhejiang Jinju Chemical utilizes the water-cooled wall waste boiler gasifier (Jinhua Furnace 3.0) technology developed by Beijing Qingchuang Jinhua Technology Co., Ltd. The gasification unit is designed as a dual-unit setup without a backup unit; the gasification pressure is 6.5 MPaG, and the volume of syngas produced is 94,000 Nm3/h (CO + H2). The water-cooled wall direct-connected waste-heat gasifier for coal-water slurry (Jinhua Furnace 3.0) replaces the existing batch fixed-bed gasifiers and low-pressure refractory brick quenched gasifiers. Production is scheduled to begin in 2021.
Reply #22021-01-13
The total investment amount is 1.2 billion yuan, including expenses for ammonia purification and synthesis
Reply #32021-01-17
The investment isn’t high; with a boiler that becomes unusable in two and a half days, the investment is likely to be low anyway

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.