HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Shanxi Hongyuan New Energy Co., Ltd.’s project for the technological upgrading and renovation of its 720,000-ton/year coke-making facility with a carbonization chamber height of 6.25 meters (Phase II)

2026-04-11View Original

Thread Content

On April 7, the People’s Government of Gu County issued a draft for public comments on the environmental impact assessment for the second phase of the technical upgrade project for Shanxi Hongyuan New Energy Co., Ltd., which involves an annual production capacity of 720,000 tons using coke ovens with a carbonization chamber height of 6.25 meters. The relevant details are as follows: I. Project Overview Project Name: Technical upgrade project for Shanxi Hongyuan New Energy Co., Ltd., aiming at an annual production capacity of 720,000 tons, using coke ovens with a carbonization chamber height of 6.25 meters (Phase II). Location: Jianhe Chemical Industrial Park, Gu County, Linfen City, Shanxi Province. Nature of the project: Technical upgrade. Existing facilities: The first phase of the project utilized 6.25-meter-high 6253D-type coke ovens, along with supporting systems such as coal preparation equipment, dry quenching systems, chemical product recovery units, as well as facilities for flue gas desulfurization and denitrification and advanced wastewater treatment systems; this setup enabled an annual coke production capacity of 2.16 million tons. Construction contents: Add a coking-related washing and sorting workshop with a processing capacity of 1.8 million tons per year ; New coal storage and distribution facilities ; Add 1×65-hole 6.25m 6253D type ramming coke oven ; New gas purification units such as primary coolers, desulfurization towers, regeneration towers, and saturators have been added ; New ammonium sulfate production unit using desulfurization waste liquid ; Renovate and expand the existing biological treatment units for wastewater processing ; Construct one set of environmental protection facilities, including a reclaimed water reuse system. The coke quenching, coke screening, tank farm, waste gas treatment, and water supply systems all rely on the facilities already constructed in Phase I.
Reply #22026-04-11
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Incorrect Installation Direction of the Flange Cover on the Drain Valve of Storage Tanks https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717574 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-04-11
Thermal isostatic pressing: One of the most advanced heat treatment and shaping technologies in the world. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717580 (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #42026-04-12
【Ten Years of Great Development in Chemical Equipment】3066-2026 – A global first! Successful first flight of megawatt-class hydrogen-fueled aero-turboprop engine https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717241 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-04-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-04-15
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Choosing the Sampling Point for Pressure Gauges Below Horizontal Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717839 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-04-16
【Ten Years of Rapid Development in Chemical Equipment】The world’s first pilot plant for hydrogen metallurgy using green electricity and green hydrogen was put into operation at Ansteel’s Bayuquan production facility from 3084 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717808 (Source: Haichuan Chemical Forum (HCBBS))
Reply #82026-04-17
【Ten Years of Rapid Development in Chemical Processing Equipment】China National Petroleum’s first megawatt-class PEM hydrogen production system passed the authoritative CNAS testing and certification https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717958 (Source: HCBBS Chemical Forum)
Reply #92026-04-17
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The Use of Submersible Long-Shaft Pumps for Oil-Contaminated Sewage Pumps in Tank Areas https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717995 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #102026-04-18
【Haichuan Equipment Guessing Game】What is tied to the pipe? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718037 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.