Thread Content
1. Production ceased on April 12 (capacity: 1.5 million tons). Company: Shanxi Jinda Coal Chemical Co., Ltd. (Xiaoyi). Capacity: 1.5 million tons per year (2×65-chamber, 6.25-meter coke ovens). Status: Coal loading was stopped on April 12, and a full-scale transformation for ultra-low emissions was initiated; the shutdown is expected to last around 45 days. 2. Enterprises that will cease production in the near future (with a total production capacity of 2.78 million tons): Enterprise 1: Shanxi Pengfei Group (Xiaoyi/Fenyang), with a production capacity of 1.4 million tons per year (using 6.25-meter coke ovens); Enterprise 2: Shanxi Dongyi Coal, Electricity, and Aluminum Group (Xiaoyi), with a production capacity of 1.38 million tons per year (using 6.25-meter coke ovens). Update: Both enterprises have received notices from the Xiaoyi City Ecology and Environment Bureau to cease production in mid-to-late April in order to carry out upgrades aimed at achieving ultra-low emission standards.
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】3074-2026: Filling a gap in China’s market; pilot production of catalysts with an extremely low water-carbon ratio successful https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717537 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Haichuan Equipment Guessing Game】What is tied to the pipe? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718037 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】Successful one-time commissioning of the world’s first upgraded process for producing ethylene glycol from light hydrocarbons in Lianyungang, 3085–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Successful one-time commissioning of the world’s first upgraded process for producing ethylene glycol from light hydrocarbons in Lianyungang, 3085–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
【Haichuan Chemical History】Summary Post--Viewing Development through History! Continuously being updated! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718076 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】3087-2026: China’s first offshore mobile multi-functional platform, “Zengchan No.1”, was delivered https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718136 (Source: Haichuan Chemical Industry Forum (Hcbbs))
【In-depth Discussion on Modular Installation of HaiChuan】The first module of China’s first cross-sea pipeline corridor project has been transported, lifted, and slid into place! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718213 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】Selection of hoses and valves at the utility material hose station, as well as details regarding piping and installation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718254 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))