Transformation unit shutdown replacement

2019-05-31View Original

Thread Content

I would like to ask the experts: when a transformation unit is shut down, is it necessary to use a continuous replacement method to replace that unit? Should we still use the voltage regulation mode? Or should consecutive permutations be carried out for a period of time first, followed by pressure-raising and lowering permutations?
Reply #22019-06-11
It depends; if there is sufficient nitrogen available, continuous displacement can be carried out. Generally, hot nitrogen is used, while we employ intermittent displacement at 0.4 MPa.
Reply #32019-07-02
Yes, this also provides some protection for the catalyst, preventing a sudden drop in its temperature caused by the introduction of cold nitrogen into the hot bed layer, which could otherwise have an adverse effect on the catalyst.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.