Thread Content
On June 9, the announcement was released regarding the results of the competitive negotiation for the procurement of services related to the optimization of the green hydrogen-based CO2 reduction system for the production of green methanol, as well as its demonstration and testing. Winner: Zhejiang University. Product description: Optimization of the green methanol production system using green hydrogen to reduce CO2, along with engineering testing services. Delivery date: 2027-12-31. Full project name: Optimization and demonstration testing of the green methanol production system via green hydrogen reduction of CO2. Project owner: Shandong Electric Power Engineering Consulting Institute Co., Ltd. (Shandong Institute, **Power Investment Group). Project location: Jinan, Shandong (**Power Investment Hydrogen/Green Methanol Pilot Plant)). Shandong Electric Power Engineering Consulting Institute Co., Ltd. (hereinafter referred to as “Shandong Institute”) was established in 1958 and is affiliated with **Power Investment Group. In October 2024, **Dian Tou Group Engineering Co., Ltd. was established, operating in an integrated manner with Shandong Institute under the model of \"one organization, two brands\".
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Gas venting devices lacking rain protection measures https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723374 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3160-2026: Major breakthroughs achieved by Qingdao Institute of Energy in China’s advanced technology for insoluble sulfur https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723330 (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3162-2026: China’s first batch of independently developed intelligent welding robots for flexible offshore manufacturing put into use https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723518 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】China National Petroleum’s first such project – the Daqing Petrochemical 50,000 tons per year 1-hexene/1-octene co-production facility – was successfully completed. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723648 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Reaching international leadership levels by 3154-2026! “Evaluation of the achievements in “Key Technologies for Polymer Batch Supercritical Foaming and Its Green Industrial Application”! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722917 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The application project for Shengkang Yuan Dongli’s ultra-low calorific value gas super-hyperthermal combustion technology was successfully completed in terms of performance assessment. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723765 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest ethylene plant with a capacity of 1.8 million tons per unit was built by CCCC in Gulei from 2031 to 2026! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723864 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))