HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Successful commissioning of the turbine for Ningxia Baofeng’s 105,000 cubic meter air separation unit by Hangzhou Steam Turbine Company

2020-03-03View Original

Thread Content

Successful commissioning of turbine for 105,000-ton air separation unit at Ningxia Baofeng by Hangzhou Turbine Co., Ltd. Author/Source: Hangzhou Turbine News Date: 2020-03-03 Clicks: 8 Successful single-unit testing On February 29, 2020, the T6B64 turbine intended for use in the 105,000-ton air separation unit at Ningxia Baofeng was tested on-site by Hangzhou Turbine Co., Ltd. The turbine operated smoothly, with all operational parameters meeting the design specifications; at 3 p.m., the single-unit testing was completed successfully. Chen Zhaoyuan, vice president of Ningxia Baofeng Group, arrived at the site to oversee the process and expressed satisfaction with the test results. To ensure the successful completion of the single-unit trial run of the T6B64 turbine in one go, the on-site service staff from Hangzhou Steam Services Department communicated and coordinated repeatedly with the client and Shenyang Steam Turbine Group, exercising strict control and improving efficiency to guarantee that all preparations for the trial run of the turbine used in the air separation unit were flawless. This testing phase is taking place during the epidemic prevention and control period; all tasks are being carried out in an orderly manner, with proper protective measures in place. The staff from Hangqi’s service department have taken the lead, working hard without complaint, and they cooperate with the on-site project management to implement isolation measures in the project site while simultaneously providing on-site services. At the commissioning site, the on-site service personnel work together in coordination, arriving early to make preparations, rechecking all the equipment, and having final discussions with the client before the commissioning process begins, to ensure that all steps of the commissioning are carried out in an orderly manner. At 10 a.m., turbine T6B64 started up on time. All parameters such as turbine shaft system vibration and bearing temperature were completely normal, with excellent data that met the design requirements. At 3 p.m., thanks to the efforts and close cooperation of all parties, the single-unit trial run of the turbine T6B64 used in Ningxia Baofeng’s 105,000-ton air separation plant was a complete success. After the commissioning was completed, the owner held a summary meeting to discuss it. At this meeting, the owner’s management gave high praise to the turbines used in the air separation units, which were independently developed, designed, and manufactured by Hangzhou Turbine. Next, the on-site service personnel will continue to work closely with the owner to carry out all tasks following the individual unit tests in an orderly manner, striving together to bring the plant into operation as soon as possible.
Reply #22020-05-05
Could you introduce the technical parameters of the steam turbine?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.