HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The 90% 3D model of the gasification unit in the Yulin Chemical Gasification and Purification Project Team, along with the review meeting on operability and maintainability, were successfully completed

2020-06-28View Original

Thread Content

The review meeting on the 90% 3D model of the gasification unit, as well as its operability and maintainability, was successfully held by the Gasification and Purification Department of Shaanxi Coal Yulin Chemical Company. Author/Source: Shaanxi Coal Group Yulin Chemical Company; Date: June 26, 2020; Views: 48. From June 17 to 23, the review meeting was held at Tianchen Design Institute. Staff from the Yulin Chemical Gasification and Purification Project Team, the process package patent holders, and China Tianchen Engineering Co., Ltd. attended this review meeting. During the review meeting, professionals in process engineering, equipment, instrumentation, and electrical systems from this project team were involved throughout the process. With the support of professionals from other relevant departments within the company, and in accordance with the requirements of the EPC contract regarding digital delivery and the review of 3D models, an integrated model covering all aspects of the project was created, enabling the visualization of all elements in the plant. At the same time, the model was modified in accordance with the 60% of the 3D model review comments, with each comment being addressed one by one to ensure compliance with the review requirements, thus laying a solid foundation for digital delivery. During the review period, the technical professionals drew on their experience from operating their own factories, and had effective discussions regarding the operability and ease of maintenance for each piece of equipment, each pipeline, each valve, and each instrument. The process package patent holder provided suggestions based on experience in the operation and maintenance of complete sets of equipment. At the same time, China Tianchen Engineering Co., Ltd. optimized the design of this model based on its own practical engineering experience and the suggestions put forward by the patent holders, in order to facilitate production operations after the equipment is put into use. The successful completion of these 90% 3D model as well as the usability and maintainability reviews marks the entry of the design work into its final phase, thereby creating favorable conditions for the subsequent procurement of bulk materials and the commencement of on-site construction.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.