Progress of the Gas Power Platform Project and the Comprehensive Utilization Project of Syngas at Hualu Hengsheng (Jingzhou) Co., Ltd. campus
Thread Content
Progress on the Gas Power Platform Project and the Comprehensive Utilization of Syngas Project in the campus of Hualu Hengsheng (Jingzhou) Co., Ltd. Author/Source: Huahua Network – Coal Chemical Industry. Date: May 25, 2021. Clicks: 21. Recently, the Environmental Impact Assessment Report for the Gas Power Platform Project in the campus of Hualu Hengsheng (Jingzhou) Co., Ltd. and the Environmental Impact Assessment Report (draft for approval) for the Comprehensive Utilization of Syngas Project have been completed and submitted to the Jingzhou Ecology and Environment Bureau in Hubei Province for approval. On October 31, 2020, Shandong Hualu Hengsheng Chemical Co., Ltd. signed agreements with Jingzhou City and Jiangling County in Hubei Province to invest in the construction of the Hualu Hengsheng Jingzhou Modern Coal Chemical Industry Base in the Jiangling Economic Development Zone. Projects for a gas power platform and the comprehensive utilization of syngas have been planned for this area. Among them, the gas power platform project in the park uses coal as raw material, and employs advanced production processes such as the multi-nozzle water-coal slurry pressurized gasification process and low-temperature cryogenic separation process to produce syngas, high-pressure nitrogen, and steam. The total investment for the gas power platform project in the proposed park is 5,924.31 billion yuan. The proposed syngas comprehensive utilization project will use the crude syngas produced by the park’s gas power platform to manufacture downstream products. There are mainly two product lines: one involves using crude syngas as a raw material to produce synthetic ammonia, and then using liquid ammonia and C2 to produce urea; the other involves using crude syngas as a raw material to produce acetic acid, DMF, and mixed methylamines. The total investment for the project is 5.60379 billion yuan. The park’s gas power platform project and the proposed syngas comprehensive utilization project are designed, constructed, and put into operation simultaneously. In November 2020, Shandong Hualu Hengsheng Chemical Co., Ltd. established Hualu Hengsheng (Jingzhou) Co., Ltd., with a registered capital of 3 billion yuan. This company is responsible for the construction and operation of the gas power platform project as well as the comprehensive utilization project of syngas in the industrial park. The two projects have been registered with the Jiangling County Development and Reform Bureau; the project code for the gas power platform in the park is 2020-421024-25-03-065948, while the project code for the comprehensive utilization of syngas is 2020-421024-25-03-065974. Project Name: Hualu Hengsheng (Jingzhou) Co., Ltd. Park Gas Power Platform ProjectConstructor: Hualu Hengsheng (Jingzhou) Co., Ltd.
Location: Jiangling Economic Development Zone, Hubei (Coal, Electricity, Port and Chemicals Industrial Park)
Project Nature: New construction
Area Covered: 97.04 hectares
Staffing and Operation Rules: The project requires 420 employees; there are 333 operating days per year, with a total of 8,000 operating hours per year. Total investment: 5.924 billion yuan. The Park Gas Power Platform Project of Hualu Hengsheng (Jingzhou) Co., Ltd. (this project) and the Syngas Comprehensive Utilization Project (a downstream extension project of this one) are designed, constructed, and put into operation simultaneously. The Park Gas Power Platform Project provides raw materials and power for the Syngas Comprehensive Utilization Project, which in turn processes the products generated by the former into chemical products; the construction period for both projects is 24 months. http://img.yf116.cn/image/img/20210525/1145574235786.jpg http://img.yf116.cn/image/img/20210525/1148154249510.jpg http://img.yf116.cn/image/img/20210525/1149144255491.jpg http://img.yf116.cn/image/img/20210525/115004260019.jpg http://img.yf116.cn/image/img/20210525/115042426421.jpg This project uses coal as a raw material to produce syngas, high-pressure nitrogen, and steam. The production capacity is as follows: 1,337,976 Nm3/h of syngas (equivalent to 538,000 Nm3/h of CO+H2), 630.1 tons/h of high-pressure steam at 9.8 MpaG, 488.5 tons/h of medium-pressure steam at 4.0 MpaG, 23.3 tons/h of medium-pressure steam at 2.5 MpaG, 1,000 Nm3/h of liquid oxygen, 2,000 Nm3/h of liquid argon, 1,000 Nm3/h of liquid nitrogen, and 89,500 Nm3/h of high-pressure nitrogen at 6.5 MpaG. Project Name: Synthesis Gas Comprehensive Utilization Project of Hualu Hengsheng (Jingzhou) Co., Ltd.
Constructor: Hualu Hengsheng (Jingzhou) Co., Ltd.
Construction Location: Jiangling Economic Development Zone, Hubei (Coal, Power, Port and Chemicals Industrial Park)
Project Nature: New construction
Land Area: 620 ha
Staffing and Operation System: The project requires 280 employees, with 333 operating days per year and 8,000 operating hours annually. Total investment: 5.604 billion yuan. The Synthesis Gas Comprehensive Utilization Project (this project) is designed, constructed, and put into operation simultaneously with the Park Gas Power Platform Project of Hualu Hengsheng Jingzhou Co., Ltd. (the upstream project of this one); this project uses the coal gasification synthesis gas provided by the Park Gas Power Platform Project as raw material to produce downstream products. http://img.yf116.cn/image/img/20210525/1430215222168.jpg http://img.yf116.cn/image/img/20210525/143145226429.jpg http://img.yf116.cn/image/img/20210525/1431475230779.jpg The project uses crude syngas from the park’s gas power platform as raw material to produce downstream products. There are mainly two product chains: one involves using crude syngas to produce synthetic ammonia, and ammonia liquor and CO2 to produce urea; the other involves using crude syngas to produce acetic acid and N,N-dimethylformamide (DMF). By-product items include monomethylamine, trimethylamine, sulfur, and food-grade CO2.