HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Bid Invitation for the Purchase of the Shell of the Ammonia Synthesis Tower and Modular Ammonia Coolers for the Ammonia Synthesis Unit in the 600,000-ton-per-year ammonia synthesis and 800,000-ton-per-year urea production facility of Henan Jinkai Group Yanhua Chemical Co., Ltd

2022-05-20View Original

Thread Content

Bid Invitation for the Purchase of Ammonia Synthesis Tower Shell and Modular Ammonia Cooler Equipment for the Ammonia Synthesis Unit in the Project to Produce 600,000 tons of synthetic ammonia and 800,000 tons of urea annually by Henan Jinkai Group Yanhua Chemical Co., Ltd. Author/Source: Date: 2022-05-20 Clicks: 7 I. Bidding Conditions This project, which aims to produce 600,000 tons of synthetic ammonia and 800,000 tons of urea annually along with related facilities, has been registered with the **Investment and Construction Authority in the location of the project. The funding for this project comes from the company itself, and the bidder is Henan Jinkai Group Yan**** Company. This project is now ready for bidding, and a public domestic tender is being conducted for the procurement of the shell for the ammonia synthesis tower and the modular ammonia cooler equipment for the ammonia synthesis unit in this project. II. Project Overview and Scope of Bidding********Project Scale: The project has an annual production capacity of 600,000 tons of ammonia in total, of which 500,000 tons are synthetic ammonia, along with 800,000 tons of urea and 100,000 tons of methanol. The project utilizes advanced green and clean process technologies to transform the synthetic ammonia and urea industry, achieving a technical level that is leading in China. Energy consumption and pollutant emissions are significantly reduced. An intelligent factory is built using industrial control systems such as Distributed Control Systems (DCS) and Supervisory Control and Data Acquisition systems (SCADA). This includes various production process units such as pressurized coal gasification using space heaters, isothermal shift reaction, low-temperature methanol washing, liquid nitrogen washing, low-pressure ammonia synthesis, CO2 stripping for urea production, tubular methanol synthesis, three-column methanol distillation, and cryogenic air separation, as well as utility systems like wastewater treatment facilities, circulating fluidized bed boilers and backpressure steam turbine generators, and ammonia-based flue gas desulfurization systems. ********Bidding content and scope: This bidding project is divided into 2 bid sections: Bid Section 001, the bidding content being 1 ammonia synthesis tower shell (R-2501) ; 002 Section 2, bidding content: 1 set of modular ammonia cooler (E-2505) ; For the specific technical parameters and requirements of the goods, please refer to the tender documents. Scope of the tender: procurement of the goods themselves and related supporting equipment, as well as packaging, transportation of the purchased goods, on-site guidance for installation and commissioning, and related technical services. ********Tender number: XHTC-HW********.4 Quality standards: Must meet the **, relevant industry specifications, stipulated acceptable criteria, and the requirements set forth in the tender documents. ********Delivery period: The delivery period for Section 1 (ammonia synthesis tower shell) is within 10 months after the contract is signed and comes into effect ; The delivery deadline for Section 2 (modular ammonia coolers) is within 8 months after the contract comes into effect ; The delivery date shall be advanced as much as possible to meet the tenderer’s schedule requirements. ********Delivery method: delivery on pallet. ********Delivery location: The northern area of the industrial cluster zone in ###### County ### County, at the site designated by the tenderer for the project construction.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.